Project Details

School Project (SRACO) is an educational facility project executed under the main contractor SRACO. MS AL QAHTHANI was engaged to carry out the HVAC mechanical scope, supporting the project’s environmental control and system performance requirements.

The scope included HVAC duct fabrication, installation, insulation, and cladding, along with chilled water pipe installation, insulation, and cladding. All works were executed in accordance with approved drawings, technical specifications, and applicable project standards.

Execution Approach

Our execution approach focuses on structured planning, coordination, and controlled delivery over the project duration:

  1. Review of approved drawings and technical requirements
  2. Coordination with the main contractor and site teams
  3. Duct fabrication and material preparation
  4. Sequenced installation of ducting and chilled water piping
  5. Continuous supervision and quality checks

Scope of Services

Our HVAC and mechanical services include:

  • 01.Mechanical HVAC works
  • 02.HVAC duct fabrication
  • 03.HVAC duct installation
  • 04.HVAC duct insulation and aluminium cladding
  • 05.Chilled water pipe installation
  • 06.Chilled water pipe insulation
  • 07.Chilled water pipe aluminium cladding